C.R.E. No. 24.

Kowloon Canton Railway.

BRITISH SECTION

ESTIMATE.

Main Head

Bridgework.

Sub. Head

Major Bridge.

Bridge No.4.

One

Work

Bridge at pag 3*455, over Road.

Quantity. DESCRIPTION. N. Rate. Unit. AMOUNT. 94 -≈ 60' span & 2o x 10a arches. $ Cts. Excavation in foundations. 27,500 Item Pumping and timbering. 300 Concrete in foundations. 2/- 0.ft. 600 00 6,350 Masonry in footings. 10/- oft 6,405 00 19,950 Masonry in superstructure. 135/- 7,980 00 870 Masonry in coping,caps,hadstones etc. 140/- 1,740 00 2,790 Masonry in arches. 2,000 00 5,580 00 40 Dry stone backing. 10/- 40 30 Item Span of Girders 80' 6" landed at Kowloon. Transport, erection & painting. 4,030 Total 32,120 30 Contingincies 10% 3,212 03 Grand Total 35,332 33

Edit History

2026-06-04 21:22:26 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
C.R.E. No. 24. Kowloon Canton Railway. BRITISH SECTION ESTIMATE. Main Head Bridgework. Sub. Head Major Bridge. Bridge No.4. One Work Bridge at pag 3*455, over Road. Quantity. DESCRIPTION. N. Rate. Unit. AMOUNT. 94 -≈ 60' span & 2o x 10a arches. $ Cts. Excavation in foundations. 27,500 Item Pumping and timbering. 300 Concrete in foundations. 2/- 0.ft. 600 00 6,350 Masonry in footings. 10/- oft 6,405 00 19,950 Masonry in superstructure. 135/- 7,980 00 870 Masonry in coping,caps,hadstones etc. 140/- 1,740 00 2,790 Masonry in arches. 2,000 00 5,580 00 40 Dry stone backing. 10/- 40 30 Item Span of Girders 80' 6" landed at Kowloon. Transport, erection & painting. 4,030 Total 32,120 30 Contingincies 10% 3,212 03 Grand Total 35,332 33
Baseline (Original)
ED JenelinЯ noinnD noolwod ¿ -1") 2 00 00 CO t I 1...$. ܂ ZOITO32 H&TRO 12. BTAMIT24 C.R.E. No. 24. Kowloon Canton Railway. BRITISH SECTION ESTIMATE. baull nh brall Main Head Bridgework. Sub. Head Major Bridge. Bridge No.4. One Work Bridge at pag 3*455, over Road. Quantity. DESCRIPTION. N. 94 -≈ 60' span & 2o x 10a arches. AMOUNT. Rate. Unit. $ Cts. { 27,500 Bxarvation in foundations. Item Pumping and timbering. 300 Concrete in foundations. 6,350 | Wasonry in footings. 19,950 | Masonry in superstructure. 870 Masonry in soping,caps,hadstones ete. 2,790 Masonry in arches. 40/- 2/-0.ft. 10/- oft 278 2,000 00 135/- 140/- * * * 6,405 00 2,100 00 7,980 00 1,740 5,580 00 4,030 hry stone backing. 10/- 40 30 Item Span of Girders 80' 6" lended at Kowloon. * Transport, erection & painting. $,500 500 8 8 8 8 8 8 8 8 8 8 00 Total 32,120 30 * Contingincies 10% 3212 03 Grand Total 30.332 33
2026-06-04 21:22:26 · Baseline
View content

ED

JenelinЯ noinnD noolwod

¿

-1")

2

00

00

CO

t

I

1...$.

܂

ZOITO32 H&TRO

12.

BTAMIT24

C.R.E. No. 24.

Kowloon Canton Railway.

BRITISH SECTION

ESTIMATE.

baull nh

brall

Main Head

Bridgework.

Sub. Head

Major Bridge.

Bridge No.4.

One

Work

Bridge at pag 3*455, over Road.

Quantity.

DESCRIPTION.

N.

94

-≈ 60' span & 2o x 10a arches.

AMOUNT.

Rate.

Unit.

$

Cts.

{

27,500 Bxarvation in foundations.

Item

Pumping and timbering.

300 Concrete in foundations.

6,350 | Wasonry in footings.

19,950 | Masonry in superstructure.

870 Masonry in soping,caps,hadstones ete.

2,790 Masonry in arches.

40/-

2/-0.ft.

10/- oft

278

2,000 00

135/-

140/-

* * *

6,405 00

2,100 00

7,980 00

1,740

5,580 00

4,030 hry stone backing.

10/-

40 30

Item

Span of Girders 80' 6" lended at Kowloon.

* Transport, erection & painting.

$,500

500

8 8 8 8 8 8 8 8 8 8

00

Total

32,120

30

*

Contingincies 10%

3212 03

Grand Total

30.332 33